T-Dust Alert #9 – Hondo/Sabine South Sidewalk Has Re-Opened

WHAT?  The installation of the storm water drain to encircle the new science building footprint has reached the point where the Hondo/Sabine south sidewalk has re-opened adjacent to the construction site.

WHERE?  The sidewalk is the one leading from the C and D parking lots past the south retaining wall of Hondo Hall (Horticulture) leading to the Sabine/Crockett and Crockett/Alamito Breezeways.

WHEN?  The work on the sidewalk and the permanent wooden fence is completed.

WHAT ELSE?  Handicapped parking spots that were temporarily moved will be restored to their original locations in the D parking lot.

WHERE ELSE?  Previous T-Dust Alerts and construction updates may be found at http://www.richlandcollege.edu/construction