T-Dust Alert #58 – Partial Neches/Alamito East Sidewalk Closure

WHAT? A portion of the sidewalk extending along the east side from the first floor of Neches Hall to Alamito Hall will have to be closed temporarily.

WHY? A second-floor landing must be constructed, spanning from the new exterior Alamito elevator into the second floor interior hallway of Alamito Hall.

HOW AND WHERE? Sidewalk barricades will be erected from the southeast corner of Alamito Hall to the northeast corner of Alamito Hall beneath the work, and signage will be installed directing pedestrians to alternate sidewalk paths around the construction and other campus buildings.

WHEN? The barricades will be installed this Saturday, September 26, and will remain in place through the duration of the elevator construction that is scheduled to be completed by November 30, 2015.

HOW FUNDED? This construction is part of the $2 million ADA renovation project being funded through the District Deferred Maintenance budget.

WHAT ELSE? Thank you for your understanding and patience with any inconvenience this temporary barrier might cause.